Minor fixed to documentation

This commit is contained in:
2020-09-18 11:30:38 -05:00
parent 9531279bb7
commit 243b835d78
5 changed files with 25 additions and 22 deletions

View File

@@ -106,7 +106,7 @@ In the third line, we have the disposal costs.
& \forall m \in M, p \in P, t \in T
\end{align}
* A plant is operation at time $t$ if it was operational at time $t-1$ or it was built at time $t$. This constraint also prevents a plant from being built multiple times.
* A plant is operational at time $t$ if it was operational at time $t-1$ or it was built at time $t$. This constraint also prevents a plant from being built multiple times.
\begin{align}
& x_{pt} = x_{p,t-1} + u_{pt}