mirror of
https://github.com/ANL-CEEESA/RELOG.git
synced 2025-12-05 23:38:52 -06:00
Make distance metric configurable; fix building period bug
This commit is contained in:
@@ -14,6 +14,7 @@ The **parameters** section describes details about the simulation itself.
|
||||
|:--------------------------|:---------------|
|
||||
|`time horizon (years)` | Number of years in the simulation.
|
||||
|`building period (years)` | List of years in which we are allowed to open new plants. For example, if this parameter is set to `[1,2,3]`, we can only open plants during the first three years. By default, this equals `[1]`; that is, plants can only be opened during the first year. |
|
||||
|`distance metric` | Metric used to compute distances between pairs of locations. Valid options are: `"Euclidean"`, for the straight-line distance between points; or `"driving"` for an approximated driving distance. If not specified, defaults to `"Euclidean"`.
|
||||
|
||||
|
||||
#### Example
|
||||
@@ -21,7 +22,8 @@ The **parameters** section describes details about the simulation itself.
|
||||
{
|
||||
"parameters": {
|
||||
"time horizon (years)": 2,
|
||||
"building period (years)": [1]
|
||||
"building period (years)": [1],
|
||||
"distance metric": "driving",
|
||||
}
|
||||
}
|
||||
```
|
||||
@@ -220,6 +222,7 @@ Database | Description | Examples
|
||||
* Plants can be expanded at any time, even long after they are open.
|
||||
* All material available at the beginning of a time period must be entirely processed by the end of that time period. It is not possible to store unprocessed materials from one time period to the next.
|
||||
* Up to two plant sizes are currently supported. Variable operating costs must be the same for all plant sizes.
|
||||
* Accurate driving distances are only available for the continental United States.
|
||||
|
||||
## Output Data Format (JSON)
|
||||
|
||||
|
||||
Reference in New Issue
Block a user