|
|
@ -28,7 +28,7 @@ In this page, we describe the precise mathematical optimization model used by RE
|
|
|
|
**Products:**
|
|
|
|
**Products:**
|
|
|
|
|
|
|
|
|
|
|
|
* $\alpha_{pm}$ - Amount of material $m$ recovered by plant $t$ for each tonne of original material (`tonne/tonne`)
|
|
|
|
* $\alpha_{pm}$ - Amount of material $m$ recovered by plant $t$ for each tonne of original material (`tonne/tonne`)
|
|
|
|
* $m^\text{initial}_{lt}$ - Amount of original material to be recycled at location $l$ during time $t$ (tonne)
|
|
|
|
* $m^\text{initial}_{lt}$ - Amount of original material to be recycled at location $l$ during time $t$ (`tonne`)
|
|
|
|
|
|
|
|
|
|
|
|
**Transportation:**
|
|
|
|
**Transportation:**
|
|
|
|
|
|
|
|
|
|
|
|