@ -9,7 +9,7 @@ In this page, we describe the precise mathematical optimization model used by RE
|
|
|
|
* $L$ - Set of locations holding the original material to be recycled
|
|
|
|
* $L$ - Set of locations holding the original material to be recycled
|
|
|
|
* $M$ - Set of materials recovered during the reverse manufacturing process
|
|
|
|
* $M$ - Set of materials recovered during the reverse manufacturing process
|
|
|
|
* $P$ - Set of potential plants to open
|
|
|
|
* $P$ - Set of potential plants to open
|
|
|
|
* $T=\{1, \ldots, t^{max}\}$ - Set of time periods
|
|
|
|
* $T = \{ 1, \ldots, t^{max} \} $ - Set of time periods
|
|
|
|
|
|
|
|
|
|
|
|
### Constants
|
|
|
|
### Constants
|
|
|
|
|
|
|
|
|
|
|
@ -28,7 +28,7 @@ In this page, we describe the precise mathematical optimization model used by RE
|
|
|
|
**Products:**
|
|
|
|
**Products:**
|
|
|
|
|
|
|
|
|
|
|
|
* $\alpha_{pm}$ - Amount of material $m$ recovered by plant $t$ for each tonne of original material (`tonne/tonne`)
|
|
|
|
* $\alpha_{pm}$ - Amount of material $m$ recovered by plant $t$ for each tonne of original material (`tonne/tonne`)
|
|
|
|
* $m^\text{initial}_{lt}$ - Amount of original material to be recycled at location $l$ during time $t$ (tonne)
|
|
|
|
* $m^\text{initial}_{lt}$ - Amount of original material to be recycled at location $l$ during time $t$ (`tonne`)
|
|
|
|
|
|
|
|
|
|
|
|
**Transportation:**
|
|
|
|