Minor fixes

gh-actions
Alinson S. Xavier 5 years ago
parent 9f006c112d
commit fae21c4b1b

@ -9,7 +9,7 @@ In this page, we describe the precise mathematical optimization model used by RE
* $L$ - Set of locations holding the original material to be recycled
* $M$ - Set of materials recovered during the reverse manufacturing process
* $P$ - Set of potential plants to open
* $T=\{1, \ldots, t^{max}\}$ - Set of time periods
* $T = \{ 1, \ldots, t^{max} \} $ - Set of time periods
### Constants
@ -28,7 +28,7 @@ In this page, we describe the precise mathematical optimization model used by RE
**Products:**
* $\alpha_{pm}$ - Amount of material $m$ recovered by plant $t$ for each tonne of original material (`tonne/tonne`)
* $m^\text{initial}_{lt}$ - Amount of original material to be recycled at location $l$ during time $t$ (tonne)
* $m^\text{initial}_{lt}$ - Amount of original material to be recycled at location $l$ during time $t$ (`tonne`)
**Transportation:**

@ -203,7 +203,7 @@ function solve(instance::Instance;
if optimizer == nothing
milp_optimizer = optimizer
lp_optimizer = optimizer
else
end
@info "Building graph..."
graph = RELOG.build_graph(instance)

Loading…
Cancel
Save