update doc for storage units

pull/40/head
Jun He 2 years ago
parent 8f0661c93f
commit ad50cdd935

@ -9,6 +9,7 @@ An instance of the stochastic security-constrained unit commitment (SCUC) proble
* [Parameters](#Parameters)
* [Buses](#Buses)
* [Generators](#Generators)
* [Storage units](#Storage-units)
* [Price-sensitive loads](#Price-sensitive-loads)
* [Transmission lines](#Transmission-lines)
* [Reserves](#Reserves)
@ -173,6 +174,81 @@ Note that this curve also specifies the production limits. Specifically, the fir
}
```
### Storage units
This section describes energy storage units in the system which charge and discharge power. The storage units consume power while charging, and generate power while discharging.
| Key | Description | Default | Time series? | Uncertain?
| :---------------- | :------------------------------------------------ | :------: | :------------: | :----:
| `Bus` | Bus where the storage unit is located. Multiple storage units may be placed at the same bus. | Required | No | Yes
| `Minimum level (MWh)` | Minimum of energy level this storage unit may contain. | `0.0` | Yes | Yes
| `Maximum level (MWh)` | Maximum of energy level this storage unit may contain. | Required | Yes | Yes
| `Allow simultaneous charging and discharging` | If `false`, the storage unit is not allowed to charge and discharge at the same time (Boolean). | `true` | Yes | Yes
| `Charge cost ($/MW)` | Cost incurred for charging each MW of power into this storage unit. | Required | Yes | Yes
| `Discharge cost ($/MW)` | Cost incurred for discharging each MW of power from this storage unit. | Required | Yes | Yes
| `Charge efficiency` | Efficiency rate to charge power into this storage unit. This value must be greater than or equal to `0.0`, and less than or equal to `1.0`. | `1.0` | Yes | Yes
| `Discharge efficiency` | Efficiency rate to discharge power from this storage unit. This value must be greater than or equal to `0.0`, and less than or equal to `1.0`. | `1.0` | Yes | Yes
| `Loss factor` | The energy dissipation rate of this storage unit. This value must be greater than or equal to `0.0`, and less than or equal to `1.0`. | `0.0` | Yes | Yes
| `Minimum charge rate (MW)` | Minimum amount of power rate this storage unit may charge. | `0.0` | Yes | Yes
| `Maximum charge rate (MW)` | Maximum amount of power rate this storage unit may charge. | Required | Yes | Yes
| `Minimum discharge rate (MW)` | Minimum amount of power rate this storage unit may discharge. | `0.0` | Yes | Yes
| `Maximum discharge rate (MW)` | Maximum amount of power rate this storage unit may discharge. | Required | Yes | Yes
| `Initial level (MWh)` | Amount of energy this storage unit at time step `-1`, immediately before the planning horizon starts. | `0.0` | No | Yes
| `Last period minimum level (MWh)` | Minimum of energy level this storage unit may contain in the last time step. By default, this value is the same as the last value of `Minimum level (MWh)`. | `Minimum level (MWh)` | No | Yes
| `Last period maximum level (MWh)` | Maximum of energy level this storage unit may contain in the last time step. By default, this value is the same as the last value of `Maximum level (MWh)`. | `Maximum level (MWh)` | No | Yes
#### Example
```json
{
"Storage units": {
"su1": {
"Bus": "b2",
"Maximum level (MWh)": 100.0,
"Charge cost ($/MW)": 2.0,
"Discharge cost ($/MW)": 2.5,
"Maximum charge rate (MW)": 10.0,
"Maximum discharge rate (MW)": 8.0
},
"su2": {
"Bus": "b2",
"Minimum level (MWh)": 10.0,
"Maximum level (MWh)": 100.0,
"Allow simultaneous charging and discharging": false,
"Charge cost ($/MW)": 3.0,
"Discharge cost ($/MW)": 3.5,
"Charge efficiency": 0.8,
"Discharge efficiency": 0.85,
"Loss factor": 0.01,
"Minimum charge rate (MW)": 5.0,
"Maximum charge rate (MW)": 10.0,
"Minimum discharge rate (MW)": 2.0,
"Maximum discharge rate (MW)": 10.0,
"Initial level (MWh)": 70.0,
"Last period minimum level (MWh)": 80.0,
"Last period maximum level (MWh)": 85.0
},
"su3": {
"Bus": "b9",
"Minimum level (MWh)": [10.0, 11.0, 12.0, 13.0],
"Maximum level (MWh)": [100.0, 110.0, 120.0, 130.0],
"Allow simultaneous charging and discharging": [false, false, true, true],
"Charge cost ($/MW)": [2.0, 2.1, 2.2, 2.3],
"Discharge cost ($/MW)": [1.0, 1.1, 1.2, 1.3],
"Charge efficiency": [0.8, 0.81, 0.82, 0.82],
"Discharge efficiency": [0.85, 0.86, 0.87, 0.88],
"Loss factor": [0.01, 0.01, 0.02, 0.02],
"Minimum charge rate (MW)": [5.0, 5.1, 5.2, 5.3],
"Maximum charge rate (MW)": [10.0, 10.1, 10.2, 10.3],
"Minimum discharge rate (MW)": [4.0, 4.1, 4.2, 4.3],
"Maximum discharge rate (MW)": [8.0, 8.1, 8.2, 8.3],
"Initial level (MWh)": 20.0,
"Last period minimum level (MWh)": 21.0,
"Last period maximum level (MWh)": 22.0
}
}
}
```
### Price-sensitive loads
This section describes components in the system which may increase or reduce their energy consumption according to the energy prices. Fixed loads (as described in the `buses` section) are always served, regardless of the price, unless there is significant congestion in the system or insufficient production capacity. Price-sensitive loads, on the other hand, are only served if it is economical to do so.