|
4 years ago | |
---|---|---|
.. | ||
matpower | 5 years ago | |
or-lib | 5 years ago | |
pglib-uc | 5 years ago | |
tejada19 | 5 years ago | |
test | 4 years ago | |
README.md | 5 years ago |
README.md
Instances
UnitCommitment.jl provides a large collection of benchmark instances collected from the literature and converted to a common data format. If you use these instances in your research, we request that you cite UnitCommitment.jl, as well as the original sources, as listed below. See documentation for more details.
References
UnitCommitment.jl
- [UCJL] Alinson S. Xavier, Feng Qiu. "UnitCommitment.jl: A Julia/JuMP Optimization Package for Security-Constrained Unit Commitment". Zenodo (2020). DOI: 10.5281/zenodo.4269874
MATPOWER
-
[MTPWR] D. Zimmerman, C. E. Murillo-Sandnchez and R. J. Thomas. "Matpower: Steady-state operations, planning, and analysis tools forpower systems research and education", IEEE Transactions on PowerSystems, vol. 26, no. 1, pp. 12 –19, Feb. 2011. DOI: 10.1109/TPWRS.2010.2051168
-
[PSTCA] University of Washington, Dept. of Electrical Engineering. "Power Systems Test Case Archive". Available at: http://www.ee.washington.edu/research/pstca/ (Accessed: Nov 14, 2020)
-
[JoFlMa16] C. Josz, S. Fliscounakis, J. Maeght, and P. Panciatici. "AC Power Flow Data in MATPOWER and QCQP Format: iTesla, RTE Snapshots, and PEGASE". ArXiv (2016).
-
[FlPaCa13] S. Fliscounakis, P. Panciatici, F. Capitanescu, and L. Wehenkel. "Contingency ranking with respect to overloads in very large power systems taking into account uncertainty, preventive and corrective actions", Power Systems, IEEE Trans. on, (28)4:4909-4917, 2013. DOI: 10.1109/TPWRS.2013.2251015
PGLIB-UC
-
[PGLIB] Carleton Coffrin and Bernard Knueven. "Power Grid Lib - Unit Commitment". Available at: https://github.com/power-grid-lib/pglib-uc (Accessed: Nov 14, 2020)
-
[KrHiOn12] Eric Krall, Michael Higgins and Richard P. O’Neill. "RTO unit commitment test system." Federal Energy Regulatory Commission. Available at: https://www.ferc.gov/industries-data/electric/power-sales-and-markets/increasing-efficiency-through-improved-software-1 (Accessed: Nov 14, 2020)
-
[KnOsWa20] Bernard Knueven, James Ostrowski and Jean-Paul Watson. "On Mixed-Integer Programming Formulations for the Unit Commitment Problem". INFORMS Journal on Computing (2020). DOI: 10.1287/ijoc.2019.0944
RTS-GMLC
-
[BaBlEh19] Clayton Barrows, Aaron Bloom, Ali Ehlen, Jussi Ikaheimo, Jennie Jorgenson, Dheepak Krishnamurthy, Jessica Lau et al. "The IEEE Reliability Test System: A Proposed 2019 Update." IEEE Transactions on Power Systems (2019). DOI: 10.1109/TPWRS.2019.2925557
OR-LIB
-
[ORLIB] J.E.Beasley. "OR-Library: distributing test problems by electronic mail", Journal of the Operational Research Society 41(11) (1990). DOI: 10.2307/2582903
-
[FrGe06] A. Frangioni, C. Gentile. "Solving nonlinear single-unit commitment problems with ramping constraints" Operations Research 54(4), p. 767 - 775, 2006. DOI: 10.1287/opre.1060.0309
Tejada19
- [TeLuSa19] D. A. Tejada-Arango, S. Lumbreras, P. Sanchez-Martin and A. Ramos. "Which Unit-Commitment Formulation is Best? A Systematic Comparison," in IEEE Transactions on Power Systems. DOI: 10.1109/TPWRS.2019.2962024.