@ -264,6 +264,20 @@ Test cases used in [TeLuSa19]. These instances are similar to OR-LIB/UC, in the
| `tejada19/UC_168h_192g` | 168 | 1 | 192 | 0 | 0 | [TeLuSa19] |
| `tejada19/UC_168h_199g` | 168 | 1 | 199 | 0 | 0 | [TeLuSa19] |
### Transmission and Expansion Planning Instances
We curate a list of popular [MuSe21] transmission and expansion planning (TEP) instances used in academia paper. These TEP instances follow [UCJL format](format.md), with information on candidate transmission lines and investment costs.
| Name | Buses | Generators | Generator Cost? | Lines | Line Cost? | References |
| ----------------------- | ----- | ---------- | --------------- | ----- | ---------- | ----------- |
| `tep/garver6` | 6 | 3 | Default | 6 | Yes | [Ga70] |
| `tep/ieee24` | 24 | 32 | Default | 35 | Yes | [FaHi03] |
| `tep/ieee30` | 30 | 6 | Default | 41 | Yes | [AlDeAm13] |
| `tep/ieee118` | 118 | 70 | Yes | 186 | Yes | [KhShKa10] |
| `tep/south_brazilian` | 242 | 53 | Default | 467 | Yes | [HaMoGa00] |
| `tep/south_brazilian` | 85 | 14 | Default | 299 | Yes | [RoMoGa02] |
## References
- [UCJL] **Alinson S. Xavier, Aleksandr M. Kazachkov, Ogün Yurdakul, Feng Qiu.** "UnitCommitment.jl: A Julia/JuMP Optimization Package for Security-Constrained Unit Commitment (Version 0.3)". Zenodo (2022). [DOI: 10.5281/zenodo.4269874](https://doi.org/10.5281/zenodo.4269874)
@ -286,4 +300,18 @@ Test cases used in [TeLuSa19]. These instances are similar to OR-LIB/UC, in the
- [FrGe06] **A. Frangioni, C. Gentile.** "Solving nonlinear single-unit commitment problems with ramping constraints" Operations Research 54(4), p. 767 - 775, 2006. [DOI: 10.1287/opre.1060.0309](https://doi.org/10.1287/opre.1060.0309)
- [TeLuSa19] **D. A. Tejada-Arango, S. Lumbreras, P. Sanchez-Martin and A. Ramos.** "Which Unit-Commitment Formulation is Best? A Systematic Comparison," in IEEE Transactions on Power Systems. [DOI: 10.1109/TPWRS.2019.2962024](https://ieeexplore.ieee.org/document/8941313/).
- [TeLuSa19] **D. A. Tejada-Arango, S. Lumbreras, P. Sanchez-Martin and A. Ramos.** "Which unit-commitment formulation is best? A systematic comparison," in IEEE Transactions on Power Systems. [DOI: 10.1109/TPWRS.2019.2962024](https://ieeexplore.ieee.org/document/8941313/).
- [MuSe21] **Selçuk Mutlu, Ercan Şenyiğit.** "Literature review of transmission expansion planning problem test systems: detailed analysis of IEEE-24," in Electric Power Systems Research 201 (2021). [DOI: 10.1016/j.epsr.2021.107543](https://doi.org/10.1016/j.epsr.2021.107543)
- [Ga70] **Len L. Garver.** "Transmission network estimation using linear programming," in IEEE Transactions on Power Apparatus and Systems, vol. PAS-89, no. 7, pp. 1688-1697, Sept. 1970. [DOI: 10.1109/TPAS.1970.292825](https://ieeexplore.ieee.org/abstract/document/4074249)
- [FaHi03] **Risheng Fang, David J. Hill.** "A new strategy for transmission expansion in competitive electricity markets." IEEE Transactions on power systems 18.1 (2003): 374-380. [DOI: 10.1109/TPWRS.2002.807083](https://ieeexplore.ieee.org/document/1178822)
- [AlDeAm13] **Behnam Alizadeh, Shahab Dehghan, Nima Amjady, Shahram Jadid and Ahad Kazemi.** "Robust transmission system expansion considering planning uncertainties," IET Generation, Transmission & Distribution (2013). [DOI: 10.1049/iet-gtd.2012.0137](https://doi.org/10.1049/iet-gtd.2012.0137)
- [KhShKa10] **Amin Khodaei, Mohammad Shahidehpour and Saeed Kamalinia.** "Transmission switching in expansion planning," IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 25, NO. 3, AUGUST 2010. [DOI: 10.1109/TPWRS.2009.2039946](https://doi.org/10.1109/TPWRS.2009.2039946)
- [HaMoGa00] **S. Haffner, A. Monticelli, A. Garcia, J. Mantovani and R. Romero.** "Branch and bound algorithm for transmission system expansion planning using a transportation model," IEE Proceedings - Generation Transmission and Distribution, Vol. 147, No. 3, May 2000. [DOI: 10.1049/ip-gtd:20000337](https://doi.org/10.1049/ip-gtd:20000337)
- [RoMoGa02] **R. Romero, A. Monticelli, A. Garcia and S. Haffner.** "Test systems and mathematical models for transmission network expansion planning," IEEE Proceeding - Generation Transmission and Distribution, Vol. 149, No. 1, January 2002. [DOI: 10.1049/ip-gtd:20020026](https://doi.org/10.1049/ip-gtd:20020026)