|
|
Instances
|
|
|
=========
|
|
|
|
|
|
UnitCommitment.jl provides a large collection of benchmark instances collected
|
|
|
from the literature and converted to a common data format. If you use these instances in your research, we request that you cite UnitCommitment.jl, as well as the original sources, as listed below. [See documentation for more details](https://anl-ceeesa.github.io/UnitCommitment.jl/).
|
|
|
|
|
|
References
|
|
|
----------
|
|
|
|
|
|
### UnitCommitment.jl
|
|
|
|
|
|
* [UCJL] **Alinson S. Xavier, Feng Qiu.** "UnitCommitment.jl: A Julia/JuMP Optimization Package for Security-Constrained Unit Commitment". Zenodo (2020). [DOI: 10.5281/zenodo.4269874](https://doi.org/10.5281/zenodo.4269874)
|
|
|
|
|
|
|
|
|
### MATPOWER
|
|
|
|
|
|
* [MTPWR] **D. Zimmerman, C. E. Murillo-Sandnchez and R. J. Thomas.** "Matpower: Steady-state operations, planning, and analysis tools forpower systems research and education", IEEE Transactions on PowerSystems, vol. 26, no. 1, pp. 12 –19, Feb. 2011. [DOI: 10.1109/TPWRS.2010.2051168](https://doi.org/10.1109/TPWRS.2010.2051168)
|
|
|
|
|
|
* [PSTCA] **University of Washington, Dept. of Electrical Engineering.** "Power Systems Test Case Archive". Available at: <http://www.ee.washington.edu/research/pstca/> (Accessed: Nov 14, 2020)
|
|
|
|
|
|
* [JoFlMa16] **C. Josz, S. Fliscounakis, J. Maeght, and P. Panciatici.** "AC Power Flow
|
|
|
Data in MATPOWER and QCQP Format: iTesla, RTE Snapshots, and PEGASE". [ArXiv (2016)](https://arxiv.org/abs/1603.01533).
|
|
|
|
|
|
* [FlPaCa13] **S. Fliscounakis, P. Panciatici, F. Capitanescu, and L. Wehenkel.**
|
|
|
"Contingency ranking with respect to overloads in very large power
|
|
|
systems taking into account uncertainty, preventive and corrective
|
|
|
actions", Power Systems, IEEE Trans. on, (28)4:4909-4917, 2013.
|
|
|
[DOI: 10.1109/TPWRS.2013.2251015](https://doi.org/10.1109/TPWRS.2013.2251015)
|
|
|
|
|
|
|
|
|
### PGLIB-UC
|
|
|
|
|
|
* [PGLIB] **Carleton Coffrin and Bernard Knueven.** "Power Grid Lib - Unit Commitment". Available at: <https://github.com/power-grid-lib/pglib-uc> (Accessed: Nov 14, 2020)
|
|
|
|
|
|
* [KrHiOn12] **Eric Krall, Michael Higgins and Richard P. O’Neill.** "RTO unit commitment test system." Federal Energy Regulatory Commission. Available at: <https://www.ferc.gov/industries-data/electric/power-sales-and-markets/increasing-efficiency-through-improved-software-1> (Accessed: Nov 14, 2020)
|
|
|
|
|
|
* [KnOsWa20] **Bernard Knueven, James Ostrowski and Jean-Paul Watson.** "On Mixed-Integer Programming Formulations for the Unit Commitment Problem". INFORMS Journal on Computing (2020). [DOI: 10.1287/ijoc.2019.0944](https://doi.org/10.1287/ijoc.2019.0944)
|
|
|
|
|
|
### RTS-GMLC
|
|
|
|
|
|
* https://github.com/GridMod/RTS-GMLC
|
|
|
|
|
|
* [BaBlEh19] **Clayton Barrows, Aaron Bloom, Ali Ehlen, Jussi Ikaheimo, Jennie Jorgenson, Dheepak Krishnamurthy, Jessica Lau et al.** "The IEEE Reliability Test System: A Proposed 2019 Update." IEEE Transactions on Power Systems (2019). [DOI: 10.1109/TPWRS.2019.2925557](https://doi.org/10.1109/TPWRS.2019.2925557)
|
|
|
|
|
|
### OR-LIB
|
|
|
|
|
|
* [ORLIB] **J.E.Beasley.** "OR-Library: distributing test problems by electronic mail", Journal of the Operational Research Society 41(11) (1990). [DOI: 10.2307/2582903](https://doi.org/10.2307/2582903)
|
|
|
|
|
|
* [FrGe06] **A. Frangioni, C. Gentile.** "Solving nonlinear single-unit commitment problems with ramping constraints" Operations Research 54(4), p. 767 - 775, 2006. [DOI: 10.1287/opre.1060.0309](https://doi.org/10.1287/opre.1060.0309)
|
|
|
|
|
|
### Tejada19
|
|
|
|
|
|
* [TeLuSa19] **D. A. Tejada-Arango, S. Lumbreras, P. Sanchez-Martin and A. Ramos.** "Which Unit-Commitment Formulation is Best? A Systematic Comparison," in IEEE Transactions on Power Systems. [DOI: 10.1109/TPWRS.2019.2962024](https://ieeexplore.ieee.org/document/8941313/).
|